| Sales Tax (real property improvement — FL) | $0.00 |
| Contract Total | $0 |
| $0-down financingest. 60 months, subject to credit approval | $0/mo |
| Per installed port | $0 |
| Scenario | Property Yr 1 · 10-yr |
| Conservative — 3.25 kWh/day/portNYSERDA/Atlas measured mean · 0 kWh/yr | $0 · $0 |
| Benchmark — 6.96 kWh/day/portENERGY STAR Portfolio Manager · 0 kWh/yr | $0 · $0 |
| Our model — 15.00 kWh/day/portFC financing model assumption · 0 kWh/yr | $0 · $0 |
| Uncontrolled connected load0 × 11.5 kW (48A Universal Wall Connector) | 0.0 kW |
| With Tesla Power Sharinggroup capped at the service | 0.0 kW |
| Demand charge exposure — uncontrolled× $12.70/kW × 12 mo | $0/yr |
| Demand charge — controlled | $0/yr |
| Annual exposure avoided | $0 |
| Sell total | $0 |
| Est. cost basis (sell ÷ 1.35) | $0 |
| Of which sales commission$600/port, already inside COGS | $0 |
| Est. gross margin | $0 (0%) |